Here is our shooting schedule created by our group member Kelsey Duffy. The schedule is divided up into 3 different days of shooting this is because we wanted to make sure that we checked through our clips and take the time so that we were happy with the shots. We also separated the shooting into four different blocks to ensure that all filming went as quickly as possible and also as smoothly to give us the time to edit our clip. The shooting schedule blocks gave us a target and a deadline to meet so we could stay as focused as possible.

Shooting Blocks
      1. Dream sequence
        2.Boy in the house
        3.Newspaper delivery
                4.Waking up from the dream
Saturday- Shooting Blocks 1 and 2
10.00- arrive at location and set up props and equipment.
10.30-12.00- Filming
12.00-1.00- Lunch break
1.00-4.00- Filming
4.00-4.30- Pack up equipment
Sunday-Shooting Block 4
9.00- arrive at location and set up props and equipment.
9.30- Filming
11.30-12.30 Lunch break
12.30-2.30- Filming
2.30- Pack up equipment
Wednesday- Shooting Block 3
3.30-arrive at location and set up props and equipment
4.00- 6.30- Filming
6.30- Pack up equipment